What an acceleration at a cut adds to a path that starts without one, so
the sum leaves the cut with that acceleration.
The companion of carriedRate one derivative up: the quintic Hermite
basis of a unit initial acceleration over duration seconds,
D^2 u^2 (1 - u)^3 / 2 with u = elapsed / D, the one quintic with zero
value and slope and unit acceleration at the start and zero value, slope
and acceleration at the end. A minimum-jerk path, carriedRate and this
term together are the quintic through any value, rate and acceleration at
one end and rest at the other, so two motions joined with all three matched
meet without a step in acceleration. Read backwards in time, with
duration - elapsed, the term sets the acceleration a path arrives with;
an acceleration keeps its sign under that mirror, where a rate changes it.
The term rises to PEAK times the squared duration at two fifths of it and
returns without crossing zero.
Parameters
duration: number
Seconds over which the acceleration is carried; positive.
elapsed: number
Seconds since the cut; clamped into the duration.
Returns number
Seconds squared: the displacement per unit acceleration.
Throws
When the duration is not positive and finite, or the elapsed time is not finite.
What an acceleration at a cut adds to a path that starts without one, so the sum leaves the cut with that acceleration.
The companion of carriedRate one derivative up: the quintic Hermite basis of a unit initial acceleration over
durationseconds,D^2 u^2 (1 - u)^3 / 2withu = elapsed / D, the one quintic with zero value and slope and unit acceleration at the start and zero value, slope and acceleration at the end. A minimum-jerk path,carriedRateand this term together are the quintic through any value, rate and acceleration at one end and rest at the other, so two motions joined with all three matched meet without a step in acceleration. Read backwards in time, withduration - elapsed, the term sets the acceleration a path arrives with; an acceleration keeps its sign under that mirror, where a rate changes it. The term rises toPEAKtimes the squared duration at two fifths of it and returns without crossing zero.