The ASSEMBLE consumer: fold the editor's cut-list into an IAutoMovieSequence over the shots the pipeline actually built, or return every violation at once.
The layout gates are editorial arithmetic. Built shot ids are unique; the sequence id and each entry's shot id are non-blank; the frame rate is finite and positive; there is at least one entry; every entry names a built shot whose duration is finite and positive; a trim has a finite positive duration and a finite start, and lies inside [0, shot.duration]; the entry rate is finite and positive with a representable positive output span; the first entry has no transition; and a transition is finite and positive, no longer than either neighbour's played span, and does not overlap the previous entry's own incoming transition inside that entry. An event trim resolves two exact, uniquely occurring built shot events to the same numeric source span before these checks. Pacing and continuity rationale stay prose.
runtime is in seconds: the sum of each entry's played output span (retained source duration divided by the entry rate) minus each transition's duration, since a transition overlaps the previous entry's tail. An unrepresentable runtime is refused at entries. Each event requirement addresses one playback entry and must match one built shot interaction event after trim and seam ownership. Prop requirements compare sampled object-motion channels on the two retained sides of hard cuts. Requirement lists and records are checked before their fields are read. The sequence copies the plan's id, name, frame rate and entries in order, borrowing numeric trim and transition objects, lowering event trims with exact source ends, and recording only nondefault playback rates.
The ASSEMBLE consumer: fold the editor's cut-list into an IAutoMovieSequence over the shots the pipeline actually built, or return every violation at once.
The layout gates are editorial arithmetic. Built shot ids are unique; the sequence id and each entry's shot id are non-blank; the frame rate is finite and positive; there is at least one entry; every entry names a built shot whose duration is finite and positive; a trim has a finite positive duration and a finite start, and lies inside
[0, shot.duration]; the entry rate is finite and positive with a representable positive output span; the first entry has no transition; and a transition is finite and positive, no longer than either neighbour's played span, and does not overlap the previous entry's own incoming transition inside that entry. An event trim resolves two exact, uniquely occurring built shot events to the same numeric source span before these checks. Pacing and continuity rationale stay prose.runtimeis in seconds: the sum of each entry's played output span (retained source duration divided by the entry rate) minus each transition's duration, since a transition overlaps the previous entry's tail. An unrepresentable runtime is refused at entries. Each event requirement addresses one playback entry and must match one built shot interaction event after trim and seam ownership. Prop requirements compare sampled object-motion channels on the two retained sides of hard cuts. Requirement lists and records are checked before their fields are read. The sequence copies the plan's id, name, frame rate and entries in order, borrowing numeric trim and transition objects, lowering event trims with exact source ends, and recording only nondefault playback rates.