Declare the actual plan-affine origin and explicit height source without
running any section or loft. Intermediate generating points name stations
on that horizontal line and the identical supplied height curve. That
vertical original owns its named station clock; world-point projection
validates construction roundoff and never supplies a replacement end.
their mismatch may only be binary64 coordinate-construction roundoff,
admitted here within 64 EPSILON times the coordinate/length scale.
The factor is an engineering roundoff policy: the current generating
affine combinations take fewer than twenty basic roundings per
coordinate, and projection/reconstruction adds roughly twenty more.
Sixty-four leaves conservative headroom for the norm and unit bridge;
it is not an interval error certificate or an anatomical tolerance.
Degenerate/ill-conditioned input may still be refused. A failed
premise returns its unavailable-source diagnostic without moving points.
Declare the actual plan-affine origin and explicit height source without running any section or loft. Intermediate generating points name stations on that horizontal line and the identical supplied height curve. That vertical original owns its named station clock; world-point projection validates construction roundoff and never supplies a replacement end. their mismatch may only be binary64 coordinate-construction roundoff, admitted here within 64 EPSILON times the coordinate/length scale. The factor is an engineering roundoff policy: the current generating affine combinations take fewer than twenty basic roundings per coordinate, and projection/reconstruction adds roughly twenty more. Sixty-four leaves conservative headroom for the norm and unit bridge; it is not an interval error certificate or an anatomical tolerance. Degenerate/ill-conditioned input may still be refused. A failed premise returns its unavailable-source diagnostic without moving points.