Whether the two spans meet or overlap within the caller's tolerance.
Signed span the role occupies on the left build-up.
Highest signed coordinate.
Lowest signed coordinate.
Shared signed length in metres; negative states the gap between spans.
Signed span the role occupies on the right build-up.
Highest signed coordinate.
Lowest signed coordinate.
The role both sides declare.
One construction role carried through a junction by both build-ups.
Produced by
matchAutoMovieAssemblyJunction. Each span is the hull of every layer of the role on that side's signed measuring line, so a role split over non-adjacent layers spans the layers between them too and can read aligned where its own layers leave a gap. The two spans are comparable only when the caller resolved both assemblies on one measuring line; the matcher does not check their axes.