Every declared subject carries exactly one of these. Totality is the point:
the alternative is a default, and any default here would be a claim nobody
made, either that an element predates the work or that it survives it.
When both ends are set, the installing phase must be a strict, possibly
indirect prerequisite of the removing phase, so installing and removing in
the same phase is refused.
When one subject enters and leaves the work.
Every declared subject carries exactly one of these. Totality is the point: the alternative is a default, and any default here would be a claim nobody made, either that an element predates the work or that it survives it.
When both ends are set, the installing phase must be a strict, possibly indirect prerequisite of the removing phase, so installing and removing in the same phase is refused.