Whether the diagnostic blocks the current operation.
Machine-readable diagnostic code from the shipped closed catalog.
Human-readable cause followed by the concrete correction owned by this phase. Do not discard it and retry unchanged.
Project-relative file or null when no one file owns it.
Pipeline phase that owns the correction.
Stable target identity.
Stable production finding with a machine identity and an owned correction.