The contact, film seconds.
The direction the joint travels at the contact.
Where the end joint is at the contact.
The launch, film seconds.
The end joint at the launch.
OptionalpeakThe joint's peak speed on the delivery unit, m/s: the unit then starts so late that it reaches this peak, the joint holding its place before. When the delivery is too short for that (the unit would have to start before the launch), the unit spans the whole delivery and its peak exceeds this one. Absent, the unit spans the whole delivery from the launch.
The share of peak speed left at the contact.
OptionalviaAn optional via point (a chamber) with the second it is reached and how early the delivery overlaps it.
Start of the motion toward the via point, film seconds.
Arrival at the via point, film seconds.
Seconds by which delivery begins before the chamber's end.
Chamber or via point in world metres.
A planned delivery, film seconds and world metres.