Cost decreased but failed the unchanged Armijo condition.
Original tilted full trials and subsequent baseline halving evaluations.
Full comparisons using a same-base correction arc.
Actual half comparisons on qualified accelerated paths with fixed correction.
First rejection cause was null or nonfinite actual cost/qualification.
Latest actual rejection cause; null before any rejected trial.
Full comparisons using the nominal physical-norm mixture.
First rejection cause was cost greater than or equal to current cost.
Full comparisons using the original-row numerical-support mixture.
Complete actual qualification passed but a lower-cost or earlier equal candidate was selected.
Generic trial-vector and fixed attribution visits, separately charged.
Bounded actual-trial attribution, independent of direction certification.