Camera transactions begun, including failures.
Joint fits actually begun, including rolled-back fits.
Joint iteration attempts, including gradient-stop checks.
Charged dimension-sweep units before point/joint work, not actual scalar-operation counts.
Six-point proposals actually started.
Attempted point designs that returned no qualified point.
Original point designs actually attempted, including refused/retried tracks.
Consumed scene work, including failed and rolled-back transactions.