Prefer another support within this many seconds of the last landing.
Pure synchronous complete placement map keyed by support bone at film seconds. Called at the initial time, candidate landings and reservation ends, possibly beyond end; outputs are cloned. Exceptions abort construction, and the callback is not retained.
Positive finite duration of an automatically scheduled swing, seconds.
Finite last construction film second, at or after start; a swing begun before end may finish later.
Pure synchronous body heading about +Y in radians at film seconds, used for leading-support ordering. Supply finite values; exceptions abort construction and the callback is not retained.
Finite nonnegative peak vertical swing clearance in metres.
Pre-reservation clearance, seconds.
Positive finite maximum horizontal step reach in metres, further limited by the chosen limb's speed/stride table.
Seconds of allowed swing overlap; negative means double support.
Complete limb and footfall declaration.
OptionalpeakAdditional peak swing pitch, radians; defaults to zero.
Pitch error lever, metres/radian.
Positive finite scheduling ticks per second.
Post-reservation clearance, seconds.
Authored unavailable intervals; empty schedules no reservations. Same-bone overlap and unknown bone ids are rejected.
Finite first construction film second; may equal end for an initial-only schedule.
OptionalswingDefault after-landing waits for an active swing to finish. The explicit from-scheduled-landing policy lets zero-duty limbs supersede it from its planned endpoint, retaining a kinematic discontinuity.
Positive finite weighted placement-error trigger in metres; includes yawLever and pitchLever contributions.
Yaw error lever, metres/radian.
Footfall geometry, pure placement samplers and numerical policy for a complete support schedule.
Film times use seconds, rate ticks/s, distances metres and angles radians; pattern supplies support identities, phase ordering and minimum remaining support count. AutoMovieStepPlanner consumes callbacks synchronously during construction and copies placements and reservations; it retains no callback after construction and propagates callback errors. The constructor checks interval, principal budgets, pattern and reservations. Callers supply finite scheduling margins, overlap, lever factors, heading results and complete desired placements; those auxiliary scalars are not all independently admitted.